top of page

Construction Details

The home is built on a solid foundation of concrete and steel attached to concrete pilings that reach to bed rock.  Walls are of concrete block, the roof is poured, reinforced concrete.  The first floor consists of the garage, mechanical room and storage.  The second floor contains all the living area, the deck and swimming pool.  It was completed in 2010.  
bottom of page